What is the Process Flow of Preparation of Ammonium Metatungstate Hydrate by Thermal Decomposition Method?

The process flow of preparing ammonium metatungstate hydrate by thermal decomposition method can be clearly summarized as follows:

 

  1. Preparation of raw materials

Main raw materials

Select high-quality ammonium paratungstate (APT) as raw material, and make sure its purity and particle size meet the production requirements.

 

Auxiliary materials

Prepare appropriate amount of additives, such as strong acidic cation exchange resin, according to the need, which is used to promote the conversion in the subsequent steps.

 

  1. Thermal decomposition process

Equipment preparation

Choose far-infrared rotary furnace or other high-temperature heating equipment to ensure that the equipment can accurately control the temperature and time.

 

Raw material input

Put the raw material of ammonium paratungstate into the heating equipment and spread it evenly so as to be heated evenly.

 

Temperature control

Set and control the heating temperature, usually between 200~280℃, the optimal temperature range may be adjusted according to the specific equipment and raw material characteristics.

 

Pyrolysis time

Control the pyrolysis time, usually around 1 hour, to ensure the full decomposition of ammonium paratungstate, but avoid overcooking to generate insoluble tungsten oxide.

 

Collection of pyrolysis products

Remove the pyrolysis products from the heating equipment, ready for the next step.

 

Dissolution and conversion

Dissolving pyrolysis products

Dissolve the pyrolysis product in deionized water preheated to 80~90℃, with the solid-liquid ratio controlled at about 1:7. During the dissolution process, the temperature will gradually rise to 90℃~98℃ to ensure that the pyrolysis products are fully dissolved.

 

Adjustment of pH value

During or after the dissolution process, add an appropriate amount of additives (e.g., strong acidic cation exchange resin) to adjust the pH value of the solution to the range of 3.5 to 4.5. This step is to promote the conversion of residual ammonium sec-tungstate.

 

Holding transformation

After adjusting the pH value, keep the solution at 90~98℃ for half an hour, so that the residual ammonium paratungstate is completely transformed into ammonium metatungstate.

 

Crystallization and drying

Evaporation crystallization

The transformed solution is subjected to evaporation and crystallization, and the concentration of ammonium metatungstate is gradually increased and crystals are precipitated by controlling the evaporation speed and temperature. The evaporation process should avoid too large crystals or incomplete crystallization.

 

Filtration and washing

The precipitated crystals are filtered and washed to remove impurities and residual solution. The washed crystals should meet certain purity requirements.

 

Drying

Dry the washed crystals at about 80℃ to remove residual water and solvent. The dried crystal is ammonium metatungstate hydrate product.

 

  1. Product collection and inspection

Product collection

Collect and package the dried ammonium metatungstate hydrate product, pay attention to moisture and humidity.

 

Quality Inspection

Conduct quality inspection on the product, including the determination of purity, particle size, moisture content and other indicators. Ensure that the product meets the requirements of relevant standards.

 

Through the above process, high-quality ammonium metatungstate hydrate products can be efficiently prepared. It should be noted that in the actual production process, the process should be adjusted and optimized according to the specific conditions to achieve the best production results.

More details of ammonium metatungstate product, please visit website: http://ammonium-metatungstate.com/
Please contact CHINATUNGSTEN for inquiry and order of ammonium metatungstate:
Email: sales@chinatungsten.com
Tel.: 86 592 5129595

0